The installation process of large generator and synchronous motor safety precautions which

Date:2013-06-13 14:35:39 Hits:

(1) in the generator, motor pits, brake (brake) based embedded platform or scaffold,safety guard rails; and the turbine chamber to isolation protection measures;

(2) repair chisel concrete, should wear protective glasses. It is forbidden to weargloves grip handle;

(3) the machine pit around the fence, non staff are not allowed to enter and exit;

(4) the stator before lifting, check the lifting tool is reliable, the steel wire rope is intact;when in place, the turbine wo should temporarily cease operations, personnel evacuation;

(5) the stator in the machine pit adjustment, should be in the hole site erection safety net, operating personnel safety belt;

(6) the rotor not into the installation position, in addition to outside the conductor, noother personnel about the arbitrary on the rotor; when the lifting rotor near the flangemouth, should be sent for inspection, to prevent the collision, the inspectors shallhand into the combination between surface;

(7) electrical equipment for each test, site should be set up temporary fence, hangingsigns, and sent the warning.

 

FEEDBACK Feedback
CHANGZHOU YUSONG ELECTRIC CO.,LTD. ADD:No.83 yangan TangShu LuoYang ChangZhou
TEL:0086-519-88792596
FAX:0086-519-88792596
E-MAIL:1226321590@qq.com
Copyright © 2014 CHANGZHOU YUSONG ELECTRIC CO.,LTD. All Rights Reserved  [Administrator]